Library of Istanbul

Heritage Hotel & Library — 12-Month Build

Roman · Byzantine · Ottoman · Republic — Four empires, one building
Project Start: March 2026
Target Opening: February 2027
7 rooms · 4 eras · 1 story
🏗️
2
Active Phases
📋
6
Pending Permits
💡
5
Ideas Captured
💰
10
Budget Items

Building Profile

Address: Hacı Beşir Tekkesi Çıkmazı No:8/1, Alemdar Mah., Fatih/İstanbul
Permitted Use: Pansiyon (Otel) — Yapı Ruhsatı 2025/4/0064
Owner: UP Kapital Danışmanlık A.Ş.
Total Area: 587.61 m² · Footprint 117.4 m²
Floors: 6 total (2 below road + 4 above) · Height 21.74m
Class/Group: V-C · Korunması Gerekli Kültür Varlığı (Protected Cultural Heritage)
Parcel: Pafta 90, Ada 31, Parsel 18 · Yapı Kimlik: 2772637679
Heritage Layers: Roman → Byzantine → Ottoman → Republic
Contractor: Mira Restorasyon İnşaat ve Danışmanlık Ltd. Şti. (Neslihan Yurttaş)
Site Chief: Yunus Demirbaş, İnşaat Mühendisi
Estimated Cost: ₺23,210,585 (₺38,900/m²)
Key Features: Brick barrel vaults, stone stairs, garden (bahçe)

Quick Timeline

Green = active phases

📅

Timeline & Milestones

12-month build schedule — March 2026 to February 2027
🏛️

Design & Architecture

7 rooms across 4 eras — Bodrum Kat to 3. Kat
7 rooms

Heritage Layers

Republic Era(1923–present)
Upper floors · Above road +12.77m (total height 21.74m)
Ottoman Era(1453–1923)
Mid floors · Timber frame (hımış) construction
Byzantine Era(330–1453)
Street level · Arched openings, brick vaulting
Roman Era(pre-330 CE)
Below road · 2 subterranean floors, -8.97m depth

📁 Drawing & Document References

💡

Ideas & Inspiration

Capture concepts, design ideas, heritage research
5

Capture a new idea

💰

Budget & Contractors

Cost tracking and team management

👷 Team & Contractors

📋

Permitting & Legal

Regulatory approvals for heritage hotel conversion
6

⚠️ Key Heritage Considerations

  • • All modifications require Koruma Kurulu (Heritage Council) pre-approval
  • • Archaeological monitoring likely required during any excavation near Roman foundations
  • • Facade changes must respect and preserve each era's visible layer
  • • MEP routing must be invisible within the heritage fabric
  • • Seismic retrofit must use methods compatible with historic masonry
📐

Architectural Drawings

DWG files converted to interactive SVG — pan and zoom to explore
Loading drawing...
Architectural Plan — balıkesirhan_6.11.2023.dwg
Scroll to zoom · Drag to pan · Dark background for clarity

Drawing Files

balıkesirhan_6.11.2023.dwg
Architectural plan · AutoCAD 2000 format (AC1015) · 33.7 MB
Download SVG ↓
Balıkesirhan_MEL+S_revize.dwg
MEP & Structural plan · AutoCAD 2007 format (AC1021) · 4.5 MB
Download SVG ↓
🗺️

Location & Context

The building in its neighbourhood — Istanbul's historic peninsula

Nearby Heritage Sites & Context

📜

History & Artefacts

Historical research, findings, and references — layered by era
0

Add historical reference or finding